• Space Capsule
  • video

Space Capsule

  • Zhongda
  • Shenyang, China
  • 30-65 days (depending on the specific drawings)
  • 50,000 tons/year
Don't buy a home. Realize your dream with our universal prefabricated capsule house platform. Why should you abide by a standard model only? We lead the industry with our core architecture, which can be freely customized from the exterior skins to the interior intelligence. If you have seen a similar one on the market, we can make it even better.

Why Limit Yourself to a Single Base Model?

Because its greatness is near perfection. At Zhongda, mass-producing "one-size-fits-all" cabins is a notion that nobody believes in. Five Additionally, the company devoted years of perfecting a single, high-performance, aviation-grade structural framework. This-base fundamental framework not only has great strength but also offers high flexibility — it is basically a top-notch platform that can be used to create almost any space capsule home trifold design featured on the market.

prefabricated capsule house
Space Capsule home
pre fab modern homes

Why Do You Benefit from This More:

Zhongda's R&D is entirely devoted to creating one structural masterpiece and not spreading the effort thin over 10 mediocre models.

Present the design you want to Zhongda, and it will be built on a stronger, more advanced structural platform.

Adapting a platform like this for any climate situation can be done only through tailored exterior systems, and a single platform like this can be used from icy polar snowfields to hot tropical islands.

prefabricated capsule house
Space Capsule home
pre fab modern homes

Technical Specifications of Pre-Capsule House:

FeatureZhongda Technical Standard
Structural FrameHigh-strength galvanized steel + 6063-T5 aviation-grade aluminum
Wind ResistanceTyphoon Level 12 (up to 120 km/h)
Seismic RatingSeismic intensity level 8
Thermal Insulation (R-Value)High-density fire-resistant thermal barrier (thickness customized by climate)
GlassDouble-glazed Low-E tempered vacuum glass (soundproof & UV-resistant)
Structural Lifespan50+ years

The above information is for your reference only. For other requirements, the engineers of Zhongda will evaluate the feasibility based on the local climate, regulations, and site conditions.


Only 4 Steps between Picture and Reality:

Tell us your thoughts:

Send Zhongda the picture reference, drawings, or competitor models that you like.

Technicality & design: Zhongda staff shall not later than 2 days deliver a structural report and a customised 3D solution.

Accurate manufacturing: Manufacturing is conducted in premium ISO-certified factories through Zhongda's master platform.

Worldwide deployment: Fully assembled shipment.Installation on-site Bareltakes 2 hours —plug & play.

prefabricated capsule house
Space Capsule home
pre fab modern homes

Case Study Global Resort Hotel Chain: Expanded 500 Rooms in 90 Days:

Problem: The task of the world's brightest green hotel brand was to change its image eloquently and to add 350 units on five islands in three countries. The whole project was expected to be finished before the peak season. Traditional methods would have required at least 18 months for completion of the entire work.

Proposal: They used the product feature of Zhongda, which is a modal prefab homes platform and got the idea of producing only one type of "minimalist sea-view room". The entire setup is intelligently equipped with the shading system and the use of corrosion-resistant materials.

Outcome: Zhongda realized 500 units and made the delivery within a period of only 3 months by means of 90% factory components. After that, the units were installed immediately. The hotel was open for business two weeks before the peak season, and therefore, when compared to the traditional hotel, a 40 % faster return on investment was achieved. From Factory to Field: Trouble-Free Delivery.

prefabricated capsule house
Space Capsule home
pre fab modern homes

Marine-Grade Triple-Layer Packaging:

During sea transport, the unit may be heavily subjected to high humidity and salt spray. Therefore, to make the unit strong enough, it is triple-protected before leaving the factory. Here are the 3 steps:

1. Complete anti-scratch protective film.

2. Vacuum moisture-proof barrier.

3. Heavy-duty impact-resistant corner ‍‌guards.

 

FAQ:

Q: How long does it take? What is your production capacity?

A: Standard models can be shipped within 7 days after the order is confirmed. Our monthly production capacity can reach up to 100 units.

Q: How long will the product last?

A: A good product can last a long time - for 15 to 20 years with normal maintenance, and it will always be a very worthwhile asset.

Q: Is the product environmentally friendly?

A: Certainly. The whole process of product development, energy efficiency, and use of sustainable materials has been planned to have a minimum environmental impact from the very start of the design stage.

prefabricated capsule house
Space Capsule home
pre fab modern homes

Engineering Quality You Can Trust:

Zhongda does not just produce mobile homes. Every one of the prefab modern homes is manufactured under the same tough standards as national-level steel bridges. With 20 years of heavy industrialization, Zhongda is able to guarantee industrial-grade safety in residential areas.


prefabricated capsule house


1. More than 20 years of direct industrial manufacturing experience.

Since 2002, Zhongda has accumulated over 20 years of experience in steel structures. The company runs a 120,000 m²production plant equipped with 1,000-ton presses, large plate-rolling machines, and other heavy industrial equipment.

2. National-Level Certifications & Awards.

Zhongda is one of the few major steel companies to have been granted the Grade-A steel structure contracting qualification, buildin,g and municipal construction licenses. The projects have been highly recognized as well, such as the Luban Award and the China Steel Structure Gold Award, which are the highest construction honors in China.

3. 50,000-Ton Annual Capacity.

An annual production of 50,000 tons is possible through automated production lines. Therefore, even the orders of large worldwide hotel chains can be delivered on time and with high quality.

4. Proven in Landmark Projects.

Moreover, before the Shenyang New World Expo Center and the Dongta Hunhe River Bridge were major landmarks where Zhongda's technology was thoroughly tested, the latter was done with 20,000 tons of steel. Zhongda, a certified supplier and strategic partner of CSCEC, CREC, and CCCC, advocates engineering quality, and its work easily obtains the highest scores from the most stringent third-party inspections‌‍ ‍‌worldwide.


Space Capsule home

Related Products

Get the latest price? We will reply as soon as possible (within 12 hours)